Skip to content
Euro Steel

Start typing to search

Search across building types, sub-categories, solutions and projects.

Power Plant

Almaty Combined-Cycle Power Plant Steel

Almaty, Kazakhstan2016
11,000 t
Steel tonnage
45 m
Turbine hall height
38 m
Boiler house span
EN 1090 EXC4
Execution class

About the Project

For a combined-cycle power plant, 11,000 tons of structural steel were produced spanning the turbine hall, boiler steel structure, stack platforms and pipe bridges. Material selection addressed low-temperature notch toughness required by the regional climate. Erection was completed on schedule under cold-weather conditions.

Almaty Combined-Cycle Power Plant SteelPower Plant

Scope of Work

  • Plant structural steel engineering coordination
  • Fabrication of low-temperature-tough materials
  • Heavy equipment platforms and stack steel production
  • Industrial protective painting
  • Cold-climate on-site erection and commissioning

Project Gallery

Almaty Combined-Cycle Power Plant SteelAlmaty, Kazakhstan

Let's talk about your next steel structure

Whether it is an industrial plant, a power station or a steel bridge, our engineering team is with you from feasibility to turnkey erection. Share your drawings and requirements, and we will come back with a concrete proposal.

Request a quote